Date | Softening Point | Product |
---|---|---|
2025-07-30 13:07:26 | 96 | underlayment |
2025-07-29 13:42:41 | 101 | underlayment |
2025-07-28 13:13:05 | 113 | high-temperature |
2025-07-24 15:29:05 | 96 | underlayment |
2025-07-23 11:51:09 | 96 | underlayment |
2025-07-22 15:54:36 | 100 | underlayment |
2025-07-21 12:11:17 | 109 | high-temperature |
2025-07-18 13:33:27 | 100 | underlayment |
2025-07-16 11:35:43 | 100 | underlayment |
2025-07-14 13:54:51 | 99 | underlayment |
2025-07-11 13:25:42 | 100 | underlayment |
2025-07-10 11:57:27 | 99 | underlayment |
2025-07-09 11:57:37 | 100 | underlayment |
2025-07-07 11:56:52 | 104 | underlayment |
2025-07-05 16:34:11 | 101 | underlayment |
2025-07-04 11:59:19 | 100 | underlayment |
2025-07-03 12:01:13 | 105 | underlayment |
2025-07-02 15:11:27 | 99 | underlayment |
2025-06-25 19:16:06 | Test | underlayment |
2025-06-25 12:26:39 | 104 | underlayment |
Batch | Boiler Temperature | Mixer Temperature | Coating Tank Heaters | Coating Tank Oil | Water Circulation | Fiberglass in shaft | RF in shaft | Sand Ready | Fiberglass properly installed |
---|---|---|---|---|---|---|---|---|---|
07/30/2025 | 240 | 155 | yes | yes | yes | yes | yes | yes | yes |
07/29/2025 | 238 | 159 | yes | yes | yes | yes | yes | yes | no |
07/28/2025 | 290 | 155 | yes | yes | yes | yes | no | no | yes |
07/24/2025 | 230 | 160 | yes | no | yes | yes | yes | yes | yes |
07/22/2025 | 223 | 150 | yes | yes | yes | yes | yes | yes | yes |
07/15/2025 | 215 | 160 | yes | yes | yes | yes | yes | yes | yes |
07/21/2025 | 226 | 160 | yes | yes | yes | yes | yes | no | yes |
07/18/2025 | 230 | 150 | yes | yes | yes | yes | yes | yes | yes |
140 | yes |
Date | Product | Back Surface Integrity | Front Surface Integrity | Side Lap Integrity (if applicable) | Winding Integrity | Thickness Left Side (mm) | Thickness Right Side (mm) | Weight (kg) |
---|---|---|---|---|---|---|---|---|
07/30/2025 | STAR | pass | pass | pass | pass | 1.1 | 11 | 29 |
07/29/2025 | BEM | pass | pass | pass | pass | 1.2 | 1.2 | 27 |
07/28/2025 | PRIMO HT | pass | pass | pass | pass | 1.2 | 1.3 | 26 |
07/24/2025 | BEM | pass | pass | pass | pass | 1.1 | 1.1 | 27 |
07/24/2025 | BEM | pass | pass | pass | pass | 1.1 | 1.2 | 28 |
07/24/2025 | BEM | pass | pass | pass | pass | 1.2 | 1.2 | 29 |
07/23/2025 | Primo Guard | pass | pass | pass | pass | 1.2 | 1.2 | 31 |
07/23/2025 | Primo Guard | pass | pass | pass | pass | 1.3 | 1.2 | 32 |
07/23/2025 | Primo Guard | pass | pass | pass | pass | 1.2 | 1.2 | 31 |
07/23/2025 | Primo Guard | pass | pass | pass | pass | 1.2 | 1.2 | 31 |
07/23/2025 | Primo Guard | pass | pass | pass | pass | 1.3 | 1.3 | 33 |
07/22/2025 | UL | pass | pass | pass | pass | 1.2 | 1.2 | 28 |
07/22/2025 | UL | pass | pass | pass | fail | 1.2 | 1.3 | 29 |
07/22/2025 | UL | pass | pass | pass | pass | 1.2 | 1.2 | 27 |
07/21/2025 | PRIMO HT | pass | pass | pass | pass | 1.3 | 1.3 | 27 |
07/21/2025 | PRIMO HT | pass | pass | pass | pass | 1.3 | 1.4 | 28 |
07/14/2025 | PRIMO HT | pass | pass | pass | pass | 1.3 | 1.4 | 28 |
07/18/2025 | Sparshield | pass | pass | pass | pass | 1.1 | 1.1 | 27 |
0.9 | 1.1 |
Date | Material | Mixer Temperature | Time | Quantity | Completed By |
---|---|---|---|---|---|
2025-07-31 01:22:37 | rf | 155 | 21:15 | 1fail 3pass | Hasan and Ahmad |
2025-07-31 01:12:18 | sbs | 150 | 19:30 | 28 bags | Hasan |
2025-07-31 01:11:34 | fg | 150 | 20:45 | 1 | Hasan and Ahmad |
2025-07-31 01:10:21 | asphalt | 150 | 19:00 | 6750 | Audai |
2025-07-31 01:09:47 | mixer-heating-valve | 150 | 19:00 | The heating is turned on only through the mixer | Audai |
2025-07-30 02:10:40 | fg | 150 | 22:00 | 1 | Hasan And Ahmad |
2025-07-30 02:09:46 | rf | 150 | 22:00 | 4 | Hasan and Ahmad |
2025-07-30 02:08:54 | sbs | 145 | 20:15 | 28 bags | Audai |
2025-07-30 02:08:13 | asphalt | 170 | 19:15 | 6750 | Audai |
2025-07-30 02:07:17 | mixer-heating-valve | 170 | 19:15 | The heating is turned on only though the mixer | Audai |
2025-07-29 09:06:12 | filler | 155 | 1:20 | 7700 | Mohammad and vajid and Mehmet |
2025-07-29 09:04:30 | oil | 155 | 1:00 | 195 | Mohammad and Mehmet |
2025-07-29 02:31:33 | rf | 145 | 22:00 | 8 | Hasan and Ahmad |
2025-07-29 02:30:48 | fg | 145 | 21:30 | 1 | Hasan and Ahmad |
2025-07-29 02:22:01 | mixer-heating-valve | 175 | 20:00 | The heating is turned on only through the mixer | Audai |
2025-07-29 02:20:12 | sbs | 145 | 22:00 | 28 bags | Milan and Bhautik |
2025-07-29 02:18:49 | asphalt | 175 | 20:00 | 6750 | Audai |
2025-07-25 02:26:52 | fg | 160 | 22:00 | 1 | Hasan and Ahmad |
2025-07-25 02:26:12 | rf | 160 | 22:00 | 3 | Hasan and Ahmad |
2025-07-25 01:27:22 | mixer-heating-valve | 160 | 20:30 | 6 bags | Hasan |
2025-07-25 01:26:40 | asphalt | 160 | 20:15 | 1440 | Audai |
2025-07-25 01:25:21 | mixer-heating-valve | 160 | 20:00 | The heating is turned on only through the mixer | Audai |
2025-07-24 09:52:01 | filler | 160 | 12:30 | 5500 | Mehmet and vajid |
2025-07-24 09:49:56 | oil | 160 | 1:30 | 221 | Mohammad and vajid |
2025-07-24 02:58:48 | fg | 150 | 22:00 | 1 | Hasan and Ahmad |
Batch | Product | Winding Integrity | Skid Integrity | Correct Label | Batch # Displayed | Shrink Wrap Integrity |
---|---|---|---|---|---|---|
07/24/2025 | m | pass | pass | pass | pass | pass |
07/24/2025 | m | pass | pass | pass | pass | pass |
07/23/2025 | pg | pass | pass | pass | pass | pass |
07/23/2025 | pg | pass | pass | pass | pass | pass |
07/22/2025 | ul | pass | pass | pass | pass | pass |
07/17/2025 | ss | pass | pass | pass | pass | pass |
07/17/2025 | ul | pass | pass | pass | pass | pass |
07/17/2025 | ul | pass | pass | pass | pass | pass |
07/17/2025 | ul | pass | pass | pass | pass | pass |
07/10/2025 | ul | pass | pass | pass | pass | pass |
07/10/2025 | m | pass | pass | pass | pass | pass |
pass |
Batch | Product | Thickness | Grade | Quantity |
---|---|---|---|---|
07/29/2025 | Grade A | 1mm | LAMA UL | 20 |
07/29/2025 | Grade A | 1.2mm | LAMA UL | 40 |
07/29/2025 | Grade B | 1.2mm | LAMA UL | 40 |
07/29/2025 | Grade A | 1.2mm | STARWRAP | 510 |
07/29/2025 | Grade A | 1.2mm | MERCY 1350 | 210 |
07/28/2025 | Grade B | 1.2mm | PRIMO HT | 15 |
07/28/2025 | Grade A | 1.2mm | PRIMO HT | 360 |
07/28/2025 | Grade A | 1.2mm | LAMA HT | 90 |
07/25/2025 | Grade B | 1.2mm | STARTER TAPE | 120 |
07/25/2025 | Grade A | 1.2mm | STARTER TAPE | 768 |
07/24/2025 | Grade B | 1.2mm | LAMA UL | 16 |
07/24/2025 | Grade A | 1.35mm | PRIMO GUARD | 30 |
07/24/2025 | Grade A | 1.2mm | MERCY 1350 | 450 |
07/24/2025 | Grade A | 1.2mm | LAMA UL | 30 |
07/23/2025 | Grade B | 1.2mm | PRIMO GUARD | 35 |
07/23/2025 | Grade A | 1.35mm | PRIMO GUARD | 670 |
07/22/2025 | Grade B | 1.2mm | LAMA UL | 40 |
07/22/2025 | Grade A | 1.35mm | PRIMO GUARD | 270 |
07/22/2025 | Grade A | 1mm | LAMA UL | 180 |
07/22/2025 | Grade A | 1.2mm | LAMA UL | 240 |
07/21/2025 | Grade B | 1.2mm | PRIMO HT | 30 |
07/21/2025 | Grade A | 1.2mm | LAMA HT | 60 |
07/21/2025 | Grade A | 1.2mm | PRIMO HT | 420 |
07/18/2025 | Grade A | 1.35mm | PRIMO GUARD | 15 |
07/18/2025 | Grade A | 1.2mm | LAMA UL | 120 |
07/18/2025 | Grade B | 1.2mm | LAMA UL | 30 |
07/18/2025 | Grade A | 1.2mm | SPARSHIELD | 660 |
07/18/2025 | Grade A | 1mm | LAMA UL | 30 |
07/17/2025 | Grade B | LAMA UL |