Dashboard
Pre Production Report
Date |
Softening Point |
Product |
2025-07-14 13:54:51 |
99 |
underlayment |
2025-07-11 13:25:42 |
100 |
underlayment |
2025-07-10 11:57:27 |
99 |
underlayment |
2025-07-09 11:57:37 |
100 |
underlayment |
2025-07-07 11:56:52 |
104 |
underlayment |
2025-07-05 16:34:11 |
101 |
underlayment |
2025-07-04 11:59:19 |
100 |
underlayment |
2025-07-03 12:01:13 |
105 |
underlayment |
2025-07-02 15:11:27 |
99 |
underlayment |
2025-06-25 19:16:06 |
Test |
underlayment |
2025-06-25 12:26:39 |
104 |
underlayment |
2025-06-24 12:48:46 |
115 |
high-temperature |
2025-06-23 14:05:34 |
113 |
high-temperature |
2025-06-20 15:33:07 |
127 |
cap-sheet |
2025-06-19 12:23:11 |
100 102 |
underlayment |
2025-06-18 12:12:28 |
100 |
underlayment |
2025-06-17 11:46:27 |
98,99 |
underlayment |
2025-06-16 13:36:38 |
113 |
high-temperature |
2025-06-14 11:55:22 |
103, 105 |
underlayment |
2025-06-13 11:59:05 |
102 104 |
underlayment |
Pre Production Inpsection
Batch |
Boiler Temperature |
Mixer Temperature |
Coating Tank Heaters |
Coating Tank Oil |
Water Circulation |
Fiberglass in shaft |
RF in shaft |
Sand Ready |
Fiberglass properly installed |
07/14/2025 |
223 |
150 |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
07/11/2025 |
173 |
150 |
yes |
yes |
yes |
yes |
yes |
yes |
no |
07/10/2025 |
227 |
150 |
yes |
yes |
yes |
yes |
yes |
yes |
no |
07/09/2025 |
182 |
150 |
yes |
yes |
no |
yes |
yes |
yes |
yes |
07/09/2025 |
182 |
150 |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
07/08/2025 |
235 |
155 |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
07/07/2025 |
239 |
145 |
yes |
yes |
yes |
yes |
yes |
yes |
no |
07/04/2025 |
220 |
150 |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
|
|
150 |
yes |
|
|
|
|
|
|
In Process Inpsection
Date |
Product |
Back Surface Integrity |
Front Surface Integrity |
Side Lap Integrity (if applicable) |
Winding Integrity |
Thickness Left Side (mm) |
Thickness Right Side (mm) |
Weight (kg) |
07/14/2025 |
Primo Guard |
pass |
pass |
pass |
pass |
1.2 |
1.3 |
31 |
07/14/2025 |
UL |
pass |
pass |
pass |
pass |
1 |
1 |
25 |
07/11/2025 |
Primo Guard |
pass |
pass |
pass |
pass |
1.2 |
1.2 |
32 |
07/11/2025 |
Primo Guard |
pass |
pass |
pass |
pass |
1.2 |
1.2 |
32 |
07/11/2025 |
Primo Guard |
pass |
pass |
pass |
pass |
1.2 |
1.2 |
32 |
07/11/2025 |
Primo Guard |
pass |
pass |
pass |
pass |
1.2 |
1.2 |
28 |
07/10/2025 |
UL |
pass |
pass |
pass |
pass |
1.1 |
1.1 |
29 |
07/10/2025 |
UL |
pass |
pass |
pass |
pass |
1.1 |
1.1 |
27 |
07/10/2025 |
BEM |
pass |
pass |
pass |
pass |
1.1 |
1.1 |
28 |
07/09/2025 |
UL |
pass |
pass |
pass |
pass |
1.1 |
1.1 |
27 |
07/09/2025 |
UL |
pass |
pass |
pass |
pass |
1.1 |
1.1 |
27 |
07/09/2025 |
UL |
pass |
pass |
pass |
pass |
1.2 |
1 |
30 |
07/09/2025 |
UL |
pass |
pass |
pass |
pass |
1.2 |
1.2 |
33 |
07/09/2025 |
UL |
pass |
pass |
pass |
pass |
1.1 |
1.1 |
27 |
07/09/2025 |
UL |
pass |
pass |
pass |
pass |
1.1 |
1.1 |
26 |
07/09/2025 |
UL |
pass |
pass |
pass |
pass |
1.2 |
1 |
27 |
07/08/2025 |
UL |
pass |
pass |
pass |
pass |
1 |
1 |
26 |
07/08/2025 |
UL |
pass |
pass |
pass |
pass |
1 |
1 |
25 |
|
|
pass |
|
|
|
|
|
|
Batch Preparation
Date |
Material |
Mixer Temperature |
Time |
Quantity |
Completed By |
2025-07-15 11:15:16 |
oil |
170 |
12:00 |
195 |
Mehmet and Mohammad |
2025-07-15 11:14:21 |
filler |
170 |
12:15 |
7700 |
Mohammad and vajid |
2025-07-15 02:29:55 |
rf |
160 |
22:00 |
7 |
Hasan and Ahmad |
2025-07-15 02:29:09 |
fg |
160 |
21:30 |
1 |
Hasan and Ahmad |
2025-07-15 02:28:22 |
asphalt |
150 |
19:30 |
28 bags |
Milan |
2025-07-15 02:27:02 |
asphalt |
150 |
19:00 |
6750 |
Audai |
2025-07-11 11:06:24 |
filler |
170 |
12:20 |
8620 |
Mohammad and vajid |
2025-07-11 11:05:47 |
oil |
170 |
12:00 |
220 |
Mehmet and Mohammad |
2025-07-11 02:45:43 |
rf |
170 |
22:30 |
6 |
Hasan and Ahmad |
2025-07-11 02:44:50 |
fg |
170 |
22:00 |
1 |
Hasan and Ahmad |
2025-07-11 02:44:11 |
sbs |
170 |
20:30 |
32bags |
Priyansh |
2025-07-11 02:43:32 |
asphalt |
170 |
20:00 |
7650 |
Audai |
2025-07-10 11:16:16 |
oil |
165 |
12:40 |
8620 |
Mohammad and vajid |
2025-07-10 11:15:33 |
oil |
165 |
12:30 |
220 |
Mohammad and Mehmet |
2025-07-10 02:38:49 |
fg |
160 |
22:00 |
2 |
Hasan and Ahmad |
2025-07-10 02:38:00 |
rf |
160 |
22:30 |
6 |
Hasan and Ahmad |
2025-07-10 02:37:05 |
sbs |
150 |
20:30 |
32 bags |
Priyansh |
2025-07-10 02:35:56 |
asphalt |
150 |
20:00 |
7650 |
Audai |
2025-07-09 11:11:46 |
filler |
175 |
12:40 |
8620 |
Mohammad and vajid |
2025-07-09 11:10:48 |
oil |
175 |
12:30 |
220 |
Mohammad and Mehmet |
2025-07-08 22:50:37 |
rf |
150 |
16:30 |
8 |
Hasan and Ahmad |
2025-07-08 22:49:34 |
fg |
150 |
16:00 |
1 |
Hasan and Ahmad |
2025-07-08 22:48:59 |
sbs |
150 |
16:00 |
32bags |
Sami and Milan |
2025-07-08 22:47:30 |
asphalt |
150 |
15:00 |
7650 |
Audai |
2025-07-08 11:02:12 |
filler |
185 |
12:15 |
4462 |
Mohammad and vajid |
2025-07-08 11:01:23 |
asphalt |
185 |
12:00 |
115 |
Mohammad and Mehmet |
2025-07-07 22:07:16 |
rf |
165 |
18:00 |
6 |
Hasan and Ahmad |
2025-07-07 22:06:24 |
sbs |
160 |
17:30 |
17 bags |
Priyansh |
2025-07-07 22:05:37 |
|
160 |
17:00 |
3826 |
Audai |
Post Process Inpsection
Batch |
Product |
Winding Integrity |
Skid Integrity |
Correct Label |
Batch # Displayed |
Shrink Wrap Integrity |
07/10/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/10/2025 |
m |
pass |
pass |
pass |
pass |
pass |
07/10/2025 |
m |
pass |
pass |
pass |
pass |
pass |
07/09/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/09/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/09/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/09/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/09/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/07/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/07/2025 |
ul |
pass |
pass |
pass |
pass |
pass |
07/05/2025 |
sw |
pass |
pass |
pass |
pass |
pass |
|
|
|
|
pass |
|
|
Production Report
Batch |
Product |
Thickness |
Grade |
Quantity |
07/11/2025 |
Grade B |
1.2mm |
LAMA UL |
30 |
07/11/2025 |
Grade A |
1.2mm |
STARWRAP |
300 |
07/11/2025 |
Grade A |
1.35mm |
PRIMO GUARD |
240 |
07/11/2025 |
Grade A |
1.2mm |
LAMA UL |
16 |
07/11/2025 |
Grade A |
1mm |
LAMA UL |
330 |
07/10/2025 |
Grade B |
1.2mm |
LAMA UL |
30 |
07/10/2025 |
Grade A |
1.2mm |
MERCY 1350 |
330 |
07/10/2025 |
Grade A |
1.35mm |
PRIMO GUARD |
480 |
07/10/2025 |
Grade A |
1mm |
LAMA UL |
60 |
07/09/2025 |
Grade B |
1.2mm |
LAMA UL |
30 |
07/09/2025 |
Grade A |
1.2mm |
MERCY 1350 |
330 |
07/09/2025 |
Grade A |
1mm |
LAMA UL |
30 |
07/09/2025 |
Grade A |
1.35mm |
PRIMO GUARD |
30 |
07/09/2025 |
Grade A |
1.2mm |
LAMA UL |
330 |
07/08/2025 |
Grade B |
1mm |
LAMA UL |
12 |
07/08/2025 |
Grade A |
1.35mm |
PRIMO GUARD |
25 |
07/08/2025 |
Grade A |
1.2mm |
SPARSHIELD |
120 |
07/08/2025 |
Grade A |
1mm |
LAMA UL |
360 |
07/07/2025 |
Grade B |
1mm |
Underweight |
15 |
07/07/2025 |
Grade B |
1.2mm |
LAMA UL |
10 |
07/07/2025 |
Grade A |
1.2mm |
SPARSHIELD |
30 |
07/07/2025 |
Grade A |
1.35mm |
PRIMO GUARD |
30 |
07/07/2025 |
Grade A |
1mm |
LAMA UL |
630 |
07/07/2025 |
Grade A |
1.2mm |
LAMA UL |
30 |
07/05/2025 |
Grade B |
1.2mm |
LAMA UL |
35 |
07/05/2025 |
Grade A |
1.2mm |
LAMA UL |
25 |
07/05/2025 |
Grade A |
1mm |
LAMA UL |
510 |
07/05/2025 |
Grade A |
1.2mm |
STARWRAP |
390 |
07/04/2025 |
Grade B |
|
|
|